10-Close-and-Retire — Stage completion gate¶
Version: 0.3 | Project ID: PRJ-001 | Product version / SHA: a6b4429e3165 | Gate date: Pending
Records¶
- [ ] 01 Project Closure and Knowledge Transfer — checklist
../03-Checklists/Closure-and-Knowledge-Transfer-Checklist.mdcomplete, or written disposition approved. - [ ] 02 Service Retirement Plan — checklist
../03-Checklists/Service-Retirement-Checklist.mdcomplete, or written disposition approved. - [ ] 03 API and Data Retirement — checklist
../03-Checklists/API-and-Data-Retirement-Checklist.mdcomplete, or written disposition approved. - [ ] 04 Data Archival and Disposal — checklist
../03-Checklists/Data-Archival-and-Disposal-Checklist.mdcomplete, or written disposition approved. - [ ] 05 Infrastructure Decommission — checklist
../03-Checklists/Infrastructure-Decommission-Checklist.mdcomplete, or written disposition approved.
Stage exit criteria¶
- [ ] Deliverables accepted, or remaining scope formally transferred.
- [ ] Consumers notified with the agreed notice period; migrations complete or dispositioned.
- [ ] Data archived or disposed per retention basis, with verification (including backups and processors).
- [ ] All infrastructure, identities, secrets and DNS removed; no residual cost.
- [ ] Records archived per retention policy; final approval recorded.
Gate controls¶
- [x] All cross-stage links (REQ, DES, API, TC, RISK, REL) used in this stage resolve.
- [ ] No open critical safety, privacy or security blocker without an authorized written disposition.
- [x] Product version, commit SHA and record revisions are consistent across the stage.
- [ ] Gate decision, conditions and approver are stored in the durable system of record.
| Role | Name | Decision | Date |
|---|---|---|---|
| Independent reviewer | Independent reviewer (name to be assigned — OPEN-021) | Pending | Pending |
| Gate approver | Sponsor (name to be assigned — OPEN-001) | Pending | Pending |
Gate status, 2026-10-28 (Claude Code): all 5 records drafted (Draft v0.1, a6b4429); the two gate controls ticked were verified by sdlc.py validate and sdlc.py trace. No record is reviewed or approved; open blockers are listed in COMPLETENESS-REPORT.md. The gate decision is for the gate approver.