Skip to content

05-Development-Setup — Completeness report

Product: VORAL | Pinned commit: a6b4429e3165 on app_dev of AI-Dental-Project/Visionary_Oral (uncommitted changes: no) | Date: 2026-10-28 | Mode: retrospective Drafted by: Claude Code (krinos-sdlc plugin), following the 05-Development-Setup Execution SOP. Every record is a draft pending human review and approval.

Records

Record File Sections complete Open items Validate
Access and Secrets Register KAI-VORAL-ACC-001-access-and-secrets-register.md 6 / 6 4 0 errors
CI/CD Setup KAI-VORAL-CICD-001-ci-cd-setup.md 7 / 7 5 0 errors
Coding Standards KAI-VORAL-CSTD-001-coding-standards.md 6 / 6 8 0 errors
Environment Configuration KAI-VORAL-ENV-001-environment-configuration.md 7 / 7 7 0 errors
Infrastructure Request and Change KAI-VORAL-INF-001-infrastructure-request-and-change.md 5 / 5 4 0 errors
Repository Setup KAI-VORAL-REPO-001-repository-setup.md 7 / 7 5 0 errors
SBOM and Dependency Scan KAI-VORAL-SBOM-001-sbom-and-dependency-scan.md 7 / 7 4 0 errors

Checks run 2026-10-28: sdlc.py validate — 0 errors; sdlc.py trace — no dangling or duplicate IDs; code citations resolve at a6b4429. "Sections complete" means every section is filled or states its gap as an owned OPEN- item.

Open items by owner

Owner OPEN IDs Blocks gate?
Backend Lead OPEN-017, OPEN-026, OPEN-035, OPEN-036 Yes
ML Lead OPEN-010 Yes
Product Owner OPEN-001 Yes
Security & Privacy Officer OPEN-007, OPEN-041 Yes
Sponsor OPEN-020 Yes
Tech Lead OPEN-022, OPEN-027, OPEN-037, OPEN-038, OPEN-039, OPEN-040, OPEN-043 Yes

Unverified or conflicting information

  • Everything recorded as Not recorded (history, approvals, settings outside the repository) needs confirmation from the named owner.
  • Proposed values (owners, approvers, dates, targets) are proposals, labelled as such, until a person confirms them.
  • See the stage 01 completeness report for the document-vs-code conflicts (OPEN-005, OPEN-018, OPEN-022).

Traceability gaps

none — every REQ has a design link (stage 03) and a test link (stage 07, KAI-VORAL-TC-001); 24 of 36 requirements have no executed test yet (KAI-VORAL-VER-001).

Stage gate readiness

  • All records drafted — met (draft only).
  • Records reviewed and approved — not met (OPEN-001).
  • Blocking open items cleared — not met: see the owners above with "Yes".

Suggested next step

Assign named owners (OPEN-001), close the blocking items, then route the records for review.