06-Build-and-Document — Stage completion gate¶
Version: 0.3 | Project ID: PRJ-001 | Product version / SHA: a6b4429e3165 | Gate date: Pending
Records¶
- [ ] 01 Feature Task — checklist
../03-Checklists/Feature-Task-Checklist.mdcomplete, or written disposition approved. - [ ] 02 Pull Request Description — checklist
../03-Checklists/Pull-Request-Checklist.mdcomplete, or written disposition approved. - [ ] 03 Code Review Record — checklist
../03-Checklists/Code-Review-Record-Checklist.mdcomplete, or written disposition approved. - [ ] 04 API Inventory — checklist
../03-Checklists/API-Inventory-Checklist.mdcomplete, or written disposition approved. - [ ] 05 API Documentation — checklist
../03-Checklists/API-Documentation-Checklist.mdcomplete, or written disposition approved. - [ ] 06 Repository README — checklist
../03-Checklists/README-Checklist.mdcomplete, or written disposition approved. - [ ] 07 Documentation Impact Assessment — checklist
../03-Checklists/Documentation-Impact-Checklist.mdcomplete, or written disposition approved. - [ ] 08 Change Log — checklist
../03-Checklists/Change-Log-Checklist.mdcomplete, or written disposition approved. - [ ] 09 Update the Requirements Traceability Matrix with code links — checklist
../../02-Requirements/03-Checklists/Requirements-Traceability-Matrix-Checklist.mdcomplete, or written disposition approved.
Stage exit criteria¶
- [ ] Every merged change links an issue and the REQ IDs it implements.
- [ ] Every PR passed required checks and an independent review.
- [ ] API inventory matches the routes in code at the release candidate SHA; API docs and OpenAPI updated.
- [ ] README and user-facing docs reflect the current behavior.
- [ ] Change log entries exist for all user-visible, API, security and data changes.
- [ ] RTM code columns are filled with commit SHAs.
Gate controls¶
- [x] All cross-stage links (REQ, DES, API, TC, RISK, REL) used in this stage resolve.
- [ ] No open critical safety, privacy or security blocker without an authorized written disposition.
- [x] Product version, commit SHA and record revisions are consistent across the stage.
- [ ] Gate decision, conditions and approver are stored in the durable system of record.
| Role | Name | Decision | Date |
|---|---|---|---|
| Independent reviewer | Independent reviewer (name to be assigned — OPEN-021) | Pending | Pending |
| Gate approver | Sponsor (name to be assigned — OPEN-001) | Pending | Pending |
Gate status, 2026-10-28 (Claude Code): all 8 records drafted (Draft v0.1, a6b4429); the two gate controls ticked were verified by sdlc.py validate and sdlc.py trace. No record is reviewed or approved; open blockers are listed in COMPLETENESS-REPORT.md. The gate decision is for the gate approver.