KrinosAI — Sprint Plan

Template ID: TPL-04-08 | Stage: 04-Planning | Version: 0.3
Record: KAI-VORAL-SPR-001 — retrospective draft for Visionary Oral. Not approved.

Purpose: Commit to a sprint goal and backlog items within capacity, with traceability to requirements.

Required inputs: Prioritized backlog; capacity; WBS; definition of done.

Document control

Field Required entry
Document ID KAI-VORAL-SPR-001
Template used TPL-04-08 Sprint Plan v0.3
Product / project / software version or commit SHA VORAL (Visionary Oral) / PRJ-001 / a6b4429e3165 (branch app_dev of AI-Dental-Project/Visionary_Oral)
Record status and version Draft v0.1
Author / technical reviewer / quality reviewer Claude Code (drafted with Claude Code for KrinosAI) / Tech Lead (name to be assigned) / Security & Privacy Officer (name to be assigned)
Created / updated / approved dates 2026-10-27 / 2026-10-27 / Pending
Applicable SOP and revision SOP-LC-04 v0.3
Related issue, commit, requirement and evidence links KAI-VORAL-PLN-001
Approver and decision record Pending

Applicability and evidence baseline

Product / system boundary: Web app and API (dentalapp/), doctor/admin mobile app (mobile/), PDF Lambda (dentalapp/pdf-lambda/) at a6b4429e3165, and the external services they call. Related approved requirements, risks and change records: None approved. Related drafts are listed in document control. Retrospective record? Yes — follows the Retrospective Documentation Protocol (KrinosAI lifecycle pack, 05-References/). Items are labelled Observed (code or Git at a6b4429), Measured (dated run), Stated (named person, dated) or Not recorded. Planning records are forward-looking: they plan the corrective work found in stages 01–03. No past project plan, estimates or sprints were recorded (OPEN-042); effort, cost and dates are left to their owners (OPEN-020, OPEN-025). No sprint has been planned or recorded; Sprint 1 below is a proposal. Acceptable evidence: an implementation reference (file:line at a commit SHA), a dated test record, a signed decision, a vendor agreement, or another independently verifiable artifact. Never invent approvals, clinical results, measurements or performance data.

1. Sprint goal and dates

Sprint Dates Goal
Sprint 1 (proposed) Proposed (Claude Code, for confirmation): 2026-10-29 to 2026-11-11 Close the critical security items

2. Capacity

Member Days available Notes
Team (STK-004, STK-005) Proposed (Claude Code, for confirmation): named people confirmed by their managers when the plan is approved Not recorded

3. Committed backlog items

Item Estimate REQ Owner
WP-01 (work) 3 pd (likely; Claude Code estimate) REQ-035 Security & Privacy Officer
WP-02 (work) 5 pd (likely; Claude Code estimate) REQ-034 Backend Lead
WP-03 (work) 5 pd (likely; Claude Code estimate) REQ-034 Tech Lead

4. Risks, dependencies and carry-over

Item Type Action
Production deploy needed for fixes Dependency Record deployed version (OPEN-022)

5. Sprint outcome

Item Status Evidence
Sprint 1 Not started None yet

Open issues and decisions

ID Specific gap or decision Responsible owner Due date Blocks gate? Evidence required Status
OPEN-001 Tracker project ID, named requester and sponsor, and named reviewers are not recorded Product Owner 2026-11-10 (proposed) Yes Tracker entry; names with roles Open
OPEN-020 No budget ceiling, contingency or cost estimates Sponsor 2026-11-30 (proposed) Yes Explicit numbers Open
OPEN-022 Production hosting (Vercel vs Render), deployed version and dated integration checks for Clerk, MongoDB, R2, AWS, OpenRouter, Groq, Cashfree and Resend not recorded Tech Lead 2026-11-30 (proposed) No Environment record (stage 05) with dated checks Open
OPEN-025 Milestone dates proposed only; no resources confirmed by their managers Sponsor 2026-11-10 (proposed) Yes Committed dates and people Open
OPEN-042 No project tracker, sprint history, PR descriptions or code-review records exist for past work Tech Lead 2026-12-15 (proposed) No Tracker and PR workflow in use from now on Open

Review and approval

Review role Named individual Decision Date Signed / controlled record
Author Claude Code (drafted with Claude Code) Draft 2026-10-27 This file at the commit that adds it
Technical reviewer Tech Lead (name to be assigned) Pending Pending Pending
Quality / regulatory reviewer (if applicable) Qualified regulatory reviewer (name to be assigned) Pending Pending Pending
Authorized approver Tech Lead (name to be assigned) Pending Pending Pending