07-Test-and-Validate — Stage completion gate¶
Version: 0.3 | Project ID: PRJ-001 | Product version / SHA: a6b4429e3165 | Gate date: Pending
Records¶
- [ ] 01 Test Plan — checklist
../03-Checklists/Test-Plan-Checklist.mdcomplete, or written disposition approved. - [ ] 02 Test Case — checklist
../03-Checklists/Test-Case-Checklist.mdcomplete, or written disposition approved. - [ ] 03 API Contract Test — checklist
../03-Checklists/API-Contract-Test-Checklist.mdcomplete, or written disposition approved. - [ ] 04 Bug Report — checklist
../03-Checklists/Bug-Report-Checklist.mdcomplete, or written disposition approved. - [ ] 05 AI Dataset Datasheet — checklist
../03-Checklists/AI-Dataset-Datasheet-Checklist.mdcomplete, or written disposition approved. - [ ] 06 AI Model Card — checklist
../03-Checklists/AI-Model-Card-Checklist.mdcomplete, or written disposition approved. - [ ] 07 Validation Plan — checklist
../03-Checklists/Validation-Plan-Checklist.mdcomplete, or written disposition approved. - [ ] 08 User Acceptance Test (UAT) Record — checklist
../03-Checklists/UAT-Record-Checklist.mdcomplete, or written disposition approved. - [ ] 09 Update the Requirements Traceability Matrix with test results — checklist
../../02-Requirements/03-Checklists/Requirements-Traceability-Matrix-Checklist.mdcomplete, or written disposition approved. - [ ] 10 Verification Report — checklist
../03-Checklists/Verification-Report-Checklist.mdcomplete, or written disposition approved.
Stage exit criteria¶
- [ ] Every REQ in the RTM has a test result on the release-candidate build, or an approved disposition.
- [ ] No open Critical/High defects; Medium defects have approved dispositions.
- [ ] UAT is signed by the named acceptance authority.
- [ ] For AI components: datasheets and model card are complete and the prespecified acceptance criteria are met on independent data.
- [ ] Validation results meet prespecified acceptance criteria.
- [ ] Verification report reviewed and a release recommendation recorded.
Gate controls¶
- [x] All cross-stage links (REQ, DES, API, TC, RISK, REL) used in this stage resolve.
- [ ] No open critical safety, privacy or security blocker without an authorized written disposition.
- [x] Product version, commit SHA and record revisions are consistent across the stage.
- [ ] Gate decision, conditions and approver are stored in the durable system of record.
| Role | Name | Decision | Date |
|---|---|---|---|
| Independent reviewer | Independent reviewer (name to be assigned — OPEN-021) | Pending | Pending |
| Gate approver | Sponsor (name to be assigned — OPEN-001) | Pending | Pending |
Gate status, 2026-10-28 (Claude Code): all 9 records drafted (Draft v0.1, a6b4429); the two gate controls ticked were verified by sdlc.py validate and sdlc.py trace. No record is reviewed or approved; open blockers are listed in COMPLETENESS-REPORT.md. The gate decision is for the gate approver.